Skip to content
Project Galleries
Navigation Menu
Navigation Menu
Project Galleries
Italian
«
‹
of
8
›
»
Paint strip is done. Metal work in progress
«
‹
of
2
›
»
Metal work done and in primer
Back from the media blaster
«
‹
of
2
›
»
«
‹
of
10
›
»
German
The example the client loved
«
‹
of
3
›
»
«
‹
of
2
›
»
«
‹
of
13
›
»
«
‹
of
12
›
»
Respray completed
Delivered at 8080 Grand
Major service completed, timing belt, water pump, replaced faulty fuel injectors
It rained the day we drove it from our Jackson shop for delivery but performed well
«
‹
of
2
›
»
PXL_20211103_134556519
PXL_20211103_132507422
Down to bare metal
«
‹
of
14
›
»
Superfly project on back burner
Timing belt and water pump done
Body power washed
Seat hardware and frames were sandblasted and painted
«
‹
of
6
›
»
American
Cab and bed painted and back in place
Tailgate repaired and back in place
«
‹
of
6
›
»
Prepping and ready for paint
A peak at the bottom, crank and connecting rods. A true low mileage rig with engine in good nick
Primed the engine bay
«
‹
of
6
›
»
«
‹
of
13
›
»
Runs and drives but sorting through previous shop's incomplete work
«
‹
of
6
›
»
Delivered body in primer to client
«
‹
of
10
›
»
Share this:
Facebook
X